

الوصف
This case study evaluates the future of joint intra-theater tactical airlift and distribution, with emphasis on the need for a Future Cargo Aircraft (FCA)/Light Cargo Aircraft (LCA), and the struggle between the US Army and the US Air Force for the intra-theater light cargo tactical airlift mission. The intent of this study is to evaluate the secondary and primary problems of the military's intra-theater tactical airlift gap and address the premises and validity of each issue.



