

소개
This book presents an integrated approach that combines peak load prediction and advanced control of a grid-connected solar PV system to support distribution substations. Peak load forecasting for the Bahir Dar 15 kV substation is carried out using an Artificial Neural Network trained with newly registered domestic customers, their sanction loads, and corresponding substation peak load data. The model predicts that the substation will face overloading within 22 months.



